| Model | MC 250E | MC 400E | MC 500E | MC 650E | MC 750E | |
| Power | W | 250 | 400 | 500 | 650 | 750 |
| Flow | l/h | 9000 | 11000 | 12500 | 12500 | 17500 |
| Head | m | 4.5 | 5.8 | 6.1 | 7.0 | 8.5 |
| Max Submersible depth | m | 7 | 7 | 7 | 7 | 7 |
| Outlet | inch | G1-1/4 | G1-1/4 | G1-1/4 | G1-1/4 | G1-1/4 |
| Solid | mm | 25 | 30 | 30 | 30 | 30 |
| IP grade | Grade | IPX8 | IPX8 | IPX8 | IPX8 | IPX8 |
| Switch | Float switch | Float switch | Float switch | Float switch | Float switch | |
| Weight | kg | 4 | 4.1 | 4.3 | 5.2 | 5.3 |
| Loading qty | pcs | 1680/3480/4060 | 1680/3480/4060 | 1680/3480/4060 | 1680/3480/4060 | 1680/3480/4060 |
Q:
What is our policy of the payment term ?
A:
-
100% advanced payment is the first option we prefer to taking.
-Any order valued less than USD10,000 has to be 100% prepaid.
-Irrevocable L/C at sight is acceptable for most of business.
-Irrevocable L/C with less than 60-day term will be only acceptable for some
business after negotiation.
-Any L/C with more than 60-day term will not be acceptable.
-D/P at sight will be acceptable for some business after negotiation, while other
terms will not be acceptable.
-D/A and O/A will not be acceptable basically.
-Partial payment is negotiable, but normally we require the advanced payment
no less than 30%, and the balance to be paid before shipment
Q:
How long will be the lead time for the orders to us ?
A:
-Normally the lead time for our orders is 45-60 days, depending on the order
quantity and our production schedule.
-Normally the lead time is calculated from the date of receiving the L/C or advanced
payment as agreed in contract.
-Some rush orders might be fulfilled within 30 days or even shorter time, until we
finally approve.
Q:
Do we have minimum order requirement ?
A:
-Yes, the minimum order value has to be USD2,000.
-Any order with less than USD2,000 will be only acceptable after negotiation.
-Sample order is exception.
-As for the minimum quantity for each product, please contact with us for further information.